South Farm Equestrian Centre, Grimsby for North Midland Construction
DACL supplied Concrete, Rebar, Formwork and Falsework as well as supply of Craneage and Pumps.
Kirklees College, Huddersfield, Allenbuild Limited
DACL supply Concrete, Reinforcement, Formwork and Falsework as well as supply of Craneage and Pumps.
£6.2 million Subcontract Value
37 week duration
5,000m2 Footprint with 6 Stair and Lift Cores constructed with Slipform.
Westgate, Wakefield for Clegg Construction Limited
DACL supplied Groundworks, Drainage, Concrete, Rebar, Falsework and Formwork as well as supply of Craneage and Pumps.
Anchorpoint, Sheffield
DACL supplied Groundworks, Drainage, Concrete, Rebar, Formwork and Falsework as well as supply of Craneage and Pumps.
Block A 800 m2 Footprint with stair and lift core constructed with Slipform - 5 Levels.
Block A Tower 400m2 Footprint, 9 Levels
Block B 900m2 Footprint, 6 Levels
Block C 800m2 Footprint, Levels
£4.2 million Subcontract Value
32 week duration
| |  | |
| | Tower Block A - Central Core Slipformed | |
 |  |  |
| Block A and Tower Block - Central core | Block A showing Bamtec roll out reinforcement | Block B and A Tower |
 |  |  |
| Block A Tower Block | Concrete Pour to Block B | Flying Tables - Soffit Falsework to Tower A |
Brewery Wharf, Leeds, for Totty Construction
DACL supplied Concrete, Rebar, Formwork and Falsework.
£3.2 million Subcontract Value
Duration split into phases over 2 years.
1no 5 Level Block, 2no 6 Level Blocks, 2no 8 Level Blocks and 1no 9 Level Block
 |  | |
| Two levels of Basement Carpark with Radius Ramp | Jump Form used on Lift Shafts | View of Complete Lift Shafts |
 |  | |
Urban Edge, New York Street and Ice Street, Leeds
DACL supplied Groundworks, Drainage, Concrete, Rebar, Formwork and Falsework
 |  |  |
| Block A Complete, Block B at ground floor stage | Block B Lift Shaft and Stairwell | |
 |  |  |
Page 2