Residential Projects/Reinforced Concrete Frames

South Farm Equestrian Centre, Grimsby for North Midland Construction

DACL supplied Concrete, Rebar, Formwork and Falsework as well as supply of Craneage and Pumps.

  • 5,000m2 Footprint 5 Levels Private House
  • £3.0 million Subcontract Value
  • 40 week Duration 
South Farm Equestrian Centre, GrimsbySouth Farm Equestrian Centre, GrimsbySouth Farm Equestrian Centre, Grimsby

Kirklees College, Huddersfield, Allenbuild Limited

DACL supply Concrete, Reinforcement, Formwork and Falsework as well as supply of Craneage and Pumps.

  • £6.2 million Subcontract Value
  • 37 week duration
  • 5,000m2 Footprint with 6 Stair and Lift Cores constructed with Slipform. 
Kirklees College, HuddersfieldKirklees College, HuddersfieldKirklees College, Huddersfield 

 Westgate, Wakefield for Clegg Construction Limited

DACL supplied Groundworks, Drainage, Concrete, Rebar, Falsework and Formwork as well as supply of Craneage and Pumps.

  • 4 Storey Concrete Frame with Basement and 3 Ground Floor Blocks
  • £2.1 million Subcontract Value
  • 26 week duration
Westgate, WakefieldWestgate, Wakefield 

Anchorpoint, Sheffield

DACL supplied Groundworks, Drainage, Concrete, Rebar, Formwork and Falsework as well as supply of Craneage and Pumps.

  • Block A 800 m2 Footprint with stair and lift core constructed with Slipform - 5 Levels.
  • Block A Tower 400m2 Footprint, 9 Levels
  • Block B 900m2 Footprint, 6 Levels
  • Block C 800m2 Footprint, Levels
  • £4.2 million Subcontract Value
  • 32 week duration 
 Anchorpoint, Sheffield 
 Tower Block A - Central Core Slipformed 
Anchorpoint, SheffieldAnchorpoint, SheffieldAnchorpoint, Sheffield
Block A and Tower Block - Central coreBlock A showing Bamtec roll out reinforcementBlock B and A Tower
Anchorpoint, SheffieldAnchorpoint, SheffieldAnchorpoint, Sheffield
Block A Tower BlockConcrete Pour to Block BFlying Tables - Soffit Falsework to Tower A

 Brewery Wharf, Leeds, for Totty Construction

DACL supplied Concrete, Rebar, Formwork and Falsework.

  • £3.2 million Subcontract Value
  • Duration split into phases over 2 years.
  • 1no 5 Level Block, 2no 6 Level Blocks, 2no 8 Level Blocks and 1no 9 Level Block
Brewery Wharf, LeedsBrewery Wharf, LeedsBrewery Wharf, Leeds 
Two levels of Basement Carpark with Radius Ramp Jump Form used on Lift Shafts View of Complete Lift Shafts 
Brewery Wharf, Leeds Brewery Wharf, LeedsBrewery Wharf, Leeds 

Urban Edge, New York Street and Ice Street, Leeds

DACL supplied Groundworks, Drainage, Concrete, Rebar, Formwork and Falsework

  • 2no 7 Storey Blocks
  • £2.2 million Subcontract Value
  • 45 week duration
Ice Works, LeedsIce Works, LeedsNew York Street, Leeds
 Block A Complete, Block B at ground floor stage Block B Lift Shaft and Stairwell 
Urban Edge, LeedsUrban Edge, LeedsUrban Edge, Leeds